Project
Industry Overview When the external temperature reaches above 26-27℃, especially in the case of high relative humidity, dairy cows tend to suffer from poor spirits, loss of appetite, and decreased milk production. Therefore, cooling the cow barn well in the high temperature season is an important me...
Read MoreIndustry Overview Airport arrival halls, waiting areas, exit corridors, auxiliary rooms, etc., have strong openness, large space, large flow of people, and long use time. Providing cooling measures to save energy and reduce consumption has become an urgent problem to be solved. Therefore, making ful...
Read MoreIndustry Overview With the continuous improvement of public health undertakings, the requirements of the hospital's medical environment are also constantly escalating. In our northwest region, wards, outpatient rooms, waiting areas and other areas that did not consider cooling in summer also put for...
Read MoreIndustry Overview High-speed rail stations, airports, long-distance bus stations and other entry halls, waiting areas, exit corridors, etc., have strong openness, large space, dense crowds, long use time, increase the supply of fresh air, and provide energy-saving and consumption-reducing cooling me...
Read MoreProject Overview There are 78 elevated stations on 17 lines under the jurisdiction of Beijing Metro Company. The ground platform ventilation mainly relies on natural ventilation. In the hot summer, the temperature on the platform is high and the ventilation is poor, making passengers extremely hot w...
Read MoreProject Overview The maintenance hangar workshop of a railway bureau is 232.8 meters long and 100 meters wide. The building is a steel structure workshop. The factory relies only on natural ventilation. In the hot weather in summer, the temperature in the workshop remains high, especially during ass...
Read MoreProject Overview The first phase of a high-speed rail station in Guangdong will be completed and put into use in September 2024. The outbound floor is located on the second underground floor and is a semi-open space. The urban corridor is 175 meters long and 25 meters wide, running east-west as a wh...
Read MoreProject Overview This project is located in the urban corridor and waiting area on the exit level of a high-speed railway station in Henan. It is a semi-open space. During peak passenger traffic periods, dense crowds and poor air circulation can easily lead to the accumulation of odors. Traditional...
Read MoreIndustry Overview In the large-scale communication equipment room and core equipment room, the area is about 100-400m2, the cabinet density is high, and the heat generation is large. Generally, multiple direct-expansion air-cooled large-cabinet-type precision air conditioners with large cooling capa...
Read MoreIndustry Overview Big data centers generally include IDC, comprehensive date room, etc., with high cabinet density and great heat generation. Chilled water air-conditioning systems are mostly used, and room-level or row-to-column-level air conditioners are used indoors, and hot and cold aisles are i...
Read MoreIndustry/project summary This project is a national heavyweight project and an important part of the national big data strategy of "counting in the East and counting in the west". The big data center has a physical space of a dedicated building, computing resources with strong processing capacity (i...
Read MoreSmall and medium-sized data centers usually include IDC rooms and comprehensive rooms, with high cabinet density and generating a large amount of heat. They generally use air-cooled precision air conditioning and air-cooled chilled water air conditioning cooling systems. Room level or row to row lev...
Read MoreCopyright © 2026 Aolan (Fujian) Industry Co., Ltd All Rights Reserved.
Network Supported
Leave A Message
Scan to WhatsApp :